BAKU, Azerbaijan, February 27. Drilling
operations at the Iranian Central Oil Fields Company (ICOFC) have
been significantly accelerated over the past year and a half,
Mohammad Sadegh Mehrjou, head of technical affairs at the company,
told reporters, Trend reports.
Mehrjou stated that during this period, 13 oil and gas wells
were drilled and put into operation in the ICOFC. He noted that in
the previous three years (from March 21, 2021, through March 20,
2024), the same number of wells had been drilled and commissioned,
highlighting the recent pace of activity.
He noted that over the past year, six wells underwent
enhancements and were activated for production.
The Iranian Central Oil Fields Company (ICOFC) oversees 84 oil
and gas fields across 11 Iranian provinces. So far, 13 gas fields
and 13 oil fields have been developed. The company’s maximum
production potential reaches approximately 250,000 barrels of crude
oil and 250 million cubic meters of gas per day.
---
Follow the author on X: @BaghishovElnur