ASTANA, Kazakhstan, January 31. Production
operations have been resumed at the Tengiz oil field in Kazakhstan,
Trend reports via the
country's Ministry of Energy.
According to the operational headquarters, the first well (group
metering station-52) was successfully opened today at 03:35 AM
(GMT+5). The technological installations (PBF facility) have been
launched and are functioning normally.
Currently, five wells have been brought into operation. The
technical services of Tengizchevroil are preparing for the launch
of the group metering station-53 (GMS-53). The increase in
production volumes will occur in stages as system parameters
stabilize and safety measures are fully ensured.
On January 26, the second-generation plant was successfully
launched, with its operations sustained by raw materials sourced
from the already operational Korolev field.
The Tengiz field, first discovered in 1979, is estimated to
contain 3.1 billion tons (approximately 25 billion barrels) of oil
reserves. Tengizchevroil, a joint venture established on April 6,
1993, between the government of Kazakhstan and Chevron, plays a
central role in the field's development.
Earlier, on January 18, 2026, two fires erupted at the GTES-4
power generation plant located in the field, disrupting power
distribution systems. As a result, Tengizchevroil was forced to
suspend oil production at both the Tengiz and Korolev fields for
safety reasons.